Roadwork. Reduced to one lane on I-95 between US-201 and Hinckley Road
I-95 IN BOTH DIRECTIONS: WIDTH LIMIT IN EFFECT. BETWEEN EXIT 133: US 201 AND EXIT 138: HINCKLEY ROAD (NEAR SHAWMUT). THERE IS A WIDTH LIMIT IN EFFECT. THE ROADWAY IS REDUCED TO ONE LANE BECAUSE OF BRIDGE MAINTENANCE WORK. WIDTH LIMIT 12'0". SPEED LIMIT 50 MPH. UNTIL NOVEMBER 29, 2013. COMMENT: 1-95 FAIRFIELD AND BENTON.EXIT 133 NORTHBOUND ON-RAMP IN FAIRFIELD, ME WILL BE TEMPORARILY CLOSED. THERE WILL ALSO BE A 12 FOOT MAXIMUM VEHICLE WIDTH THROUGH THE CONSTRUCTION ZONE FOR THE BRIDGE REPAIR WORK AT MILE MARKER 133 ON I-95. NORTHBOUND WIDE LOADS MUST EXIT AT EXIT 132 AND SOUTHBOUND WIDE LOADS AT EXIT 138. THE CLOSURES AND RESTRICTIONS ARE SCHEDULED TO START ON 12/8/2011 AND NORMAL TRAFFIC PATTERNS ARE SCHEDULED TO BE RESTORED IN OCTOBER 2013. PLEASE USE CAUTION THROUGHOUT THE CONSTRUCTION ZONE. |
|
11/29/2013 |
For information on construction in the Portland area call the Traffic Advisory Information line at (207) 775-MDOT. |
| New Hampshire |
| Description |
|
Completion |
| No major construction activity reported on I-95 in New Hampshire |
|
|
| Massachusetts |
| Description |
|
Completion |
| No major construction activity reported on I-95 in Massachusetts |
|
|
| Rhode Island |
| Description |
|
Completion |
No major construction activity reported on I-95 in Rhode Island
|
|
|
For updates on all construction projects, call the Community Affairs Toll Free Number at 1 (800) 354-9595. |
| Connecticut |
| Description |
|
Completion |
Roadwork. Hard shoulder closed on Drainage Repairs between Gatchen Creek and Westbrook
THE PROJECT CONSISTS OF THE RELINING OF THE DRAINAGE CULVERT THAT CARRIES INTERSTATE 95 OVER GATCHEN CREEK LOCATED JUST NORTH OF EXIT 64 (ROUTE 145) IN WESTBROOK. INITIAL ACTIVITY WILL INVOLVE THE PLACEMENT OF TEMPORARY CONCRETE BARRIERS ALONG I-95 NORTH AND SOUTHBOUND SHOULDERS JUST NORTH OF EXIT 64. WORK TO REPAIR THE CULVERT WILL THEN CONTINUE BEHIND THE SHOULDER CLOSURES. |
|
01/19/13 |
Resurfacing work on I-95 at Exit 63
THE PROJECT CONSISTS OF THE MILLING AND RESURFACING OF I-95 FROM INTERCHANGE 58 (ROUTE 77) IN GUILFORD TO THE BALDWIN BRIDGE CARRYING I-95 OVER THE CONNECTICUT RIVER AT INTERCHANGE 69 (ROUTE 9) IN OLD SAYBROOK. THE PROJECT WORK IS SCHEDULED TO BE COMPLETED IN JULY 2013. |
|
07/14/2013 |
Roadwork on Railroad Bridge between Pequot Avenue and Westford Drive
THE WORK INCLUDES AN OVERHAUL OF THE OVERHEAD CATENARY WIRE SYSTEM AND REPLACEMENT OF FIVE BRIDGES ON THE NEW HAVEN RAIL LINE BETWEEN BRIDGEPORT AND FAIRFIELD. BRIDGE NO. 0839R CARRIES THE NEW HAVEN RAIL LINE OVER WESTWAY ROAD. |
|
01/01/2014 |
Roadwork on I-95 between CT-15 and CT-58
THE PROJECT CONSISTS OF BRIDGE JOINT REPLACEMENT ON INTERSTATE 95 FROM GREENWICH TO BRANFORD, US ROUTE 1 IN THE TOWN OF FAIRFIELD, ROUTE 15 IN THE TOWN OF HAMDEN, AND ROUTE 58 IN THE TOWN OF EASTON |
|
04/30/2013 |
Bridge maintenance work between Laddins Rock Road and Greenwich
THE PROJECT CONSISTS OF BRIDGE REPAIRS THAT INCLUDE STRUCTURAL STEEL REPAIRS, BEARING REPAIR AND REPLACEMENT, CLEANING AND RESEALING FILLED BRIDGE JOINTS, REPAIRING EXPANSION JOINTS, CONSTRUCTION OF CONCRETE KEEPER BLOCKS AS WELL AS BLASTING AND PAINTING OF BEAM ENDS. BRIDGE NO. 00021 THAT CARRIES I-95 OVER LADDINS ROCK ROAD IN GREENWICH IS THE FIRST OF 7 LOCATIONS TO BE STARTED. THE ANTICIPATED COMPLETION DATE FOR ALL THE LOCATIONS IS SEPTEMBER 13, 2013.
|
|
09/13/2013 |
| |
|
|
| New York |
| No major construction activity reported on I-95 in New York |
|
|
| New Jersey Turnpike |
| No major construction activity reported on the New Jersey Turnpike |
|
|
For current New Jersey Turnpike traffic conditions, tune to Highway Advisory Radio 1610 AM (south of Exit 14) or 590 AM (north of Exit 14), or call the Turnpike's Highway Advisory Toll-Free Telephone by dialing 1-800-336-5875. |
|
|
| Pennsylvania |
| Description |
|
Completion |
No major construction activity reported on I-95 in Pennsylvania |
|
|
| Delaware |
| No major construction activity reported on I-95 in Delaware |
|
|
| Maryland |
| Description |
|
Completion |
| No major construction activity reported on I-95 in Maryland |
|
|
| Virginia |
| Description |
|
Completion |
| No major construction activity reported on I-95 in Virginia |
|
|
Call VDOT's HIGHWAY HELPLINE to report a safety hazard on Virginia's highways or to find out about road conditions during or after flooding and winter storms: 1-800-367-ROAD (1-800-367-7623). |
|
|
| North Carolina |
| Description |
|
Completion |
| No major construction activity reported on I-95 in North Carolina |
|
|
| South Carolina |
| Description |
|
Completion |
| No major construction activity reported on I-95 in South Carolina |
|
|
| Georgia |
| Description |
|
Completion |
| No major construction activity reported on I-95 in Georgia |
|
|
| Florida |
| Description |
|
Completion |
| No major construction activity reported on I-95 in Florida |
|
|
|
|
|
| Every attempt is made to provide the most current information available. Although information is periodically updated, we are not responsible for it's degree of accuracy. If you have any comments or suggestions in helping us produce a more useful guide, or if you find any inaccuracies, please bring them to our attention. |
|
|