|
| Description |
Length |
Completion |
| No major construction activity reported on I-95 in Maine |
|
|
For information on construction in the Portland area call the Traffic Advisory Information line at (207) 775-MDOT. |
| New Hampshire |
| BRIDGE MAINTENANCE OPERATIONS. BETWEEN EXIT 7 AND THE END OF I-95 (NEAR PORTSMOUTH). BRIDGE MAINTENANCE WORK IS IN PROGRESS. THIS PROJECT CONSISTS OF PAINTING THE NH APPROACH SPANS OF THE PISCATAQUA RIVER BRIDGE CARRYING I-95 OVER THE B & M RAILROAD, RANGER WAY, AND PREBLE WAY IN THE CITY OF PORTSMOUTH. |
|
12/30/11 |
| Massachusetts |
| Description |
Length |
Completion |
| No major construction activity reported on I-95 in Massachusetts |
|
|
| Rhode Island |
| Description |
Length |
Completion |
| No major construction activity reported on I-95 in Rhode Island |
|
|
For updates on all construction projects, call the Community Affairs Toll Free Number at 1 (800) 354-9595. |
| Connecticut |
| Description |
Length |
Completion |
| THE PROJECT CONSISTS OF SPOT REMOVAL, CLEANING, STEEL REPAIR, AND PAINTING OF THE BRIDGE BEAM ENDS AND THE BRIDGE JOINT AREAS OF VARIOUS AREA BRIDGE OVERPASSES AND UNDERPASSES ALONG INTERSTATE 95 IN THE CITIES OF NEW LONDON AND GROTON. |
10 mi. |
12/31/11 |
Maintenance work on Bridge Bearings I-95 at Exit 39
THE PROJECT CONSISTS OF THE REPLACEMENT OF THE EXISTING STEEL BRIDGE EXPANSION BEARINGS WITH ELASTOMERIC BEARINGS AT BRIDGE # 00150, I-95 OVER INDIAN RIVER IN MILFORD THE WORK ALSO CONSISTS OF CONCRETE KEEPER BLOCK INSTALLATION AND CONCRETE BEARING PAD REPLACEMENT. |
1 mi. |
6/21/12 |
| THE PROJECT CONSISTS OF THE RECONSTRUCTION OF I-95 IN BOTH DIRECTIONS FROM ROUTE 130 OVERPASS NEAR EXIT 33 (FERRY BOULEVARD/ROUTE 1) AND EXIT 34 (BRIDGEPORT AVENUE ROUTE 1) IN THE TOWNS OF STRATFORD AND MILFORD |
|
08/31/16 |
Roadwork on Railroad Bridge between Railroad Ave and Bridgeport
OVERHAUL OF THE OVERHEAD CATENARY WIRE SYSTEM AND REPLACEMENT OF FIVE BRIDGES ON THE NEW HAVEN RAIL LINE BETWEEN BRIDGEPORT AND FAIRFIELD. |
|
06/08/12 |
Roadwork on Railroad Bridge between Pequot Ave and Westford Dr
OVERHAUL OF THE OVERHEAD CATENARY WIRE SYSTEM AND REPLACEMENT OF FIVE BRIDGES ON THE NEW HAVEN RAIL LINE BETWEEN BRIDGEPORT AND FAIRFIELD.
|
|
06/08/12 |
Water main work on Various Bridges I-95 at Various Towns
BRIDGE JOINT REPLACEMENT ON INTERSTATE 95 FROM GREENWICH TO BRANFORD |
|
08/31/12 |
| New York |
| No major construction activity reported on I-95 in New York |
|
|
| New Jersey Turnpike |
| No major construction activity reported on I-95 in New Jersey |
|
|
For current New Jersey Turnpike traffic conditions, tune to Highway Advisory Radio 1610 AM (south of Exit 14) or 590 AM (north of Exit 14), or call the Turnpike's Highway Advisory Toll-Free Telephone by dialing 1-800-336-5875. |
|
|
| Pennsylvania |
| Description |
Length |
Completion |
Roadwork. Carriageway reduced to one lane on I-95 at Cottman Ave
CONSTRUCTION: OFF RAMP REDUCED FROM TWO LANES TO ONE. 24-HOUR RESTRICTION. |
|
04/02/12 |
Roadwork on I-95 at Exit 11
THE RIGHT SHOULDER WILL REMAIN CLOSED 24/7. |
1.0mi. |
09/01/12 |
Roadwork. Left lane closed on I-95 between 9th St and SR-202
RIGHT OR LEFT LANE CLOSURE FROM 8 P.M. TO 5 A.M. FOR BRIDGE MAINTENANCE. |
|
12/31/11 |
Lane closed on I-95 between I-495 and I-295
INTERMITTENT LANE CLOSURES AND RAMP SHIFTS FROM 9 A.M. TO 3 P.M. MONDAY THROUGH FRIDAY. |
|
12/31/11 |
| Delaware |
Roadwork. Right lane closed on I-95 between SR-7 and SR-273
INTERMITTENT RIGHT LANE CLOSURE FROM 9 A.M. TO 3 P.M. FOR DRAINAGE REPAIRS. |
|
12/31/11 |
| Maryland |
| Description |
Length |
Completion |
| No major construction activity reported on I-95 in Maryland |
|
|
| Virginia |
| Description |
Length |
Completion |
| Bridge Construction over the Occoquan River (Fairfax County) |
0.5 mi. |
05/31/12 |
Call VDOT's HIGHWAY HELPLINE to report a safety hazard on Virginia's highways or to find out about road conditions during or after flooding and winter storms: 1-800-367-ROAD (1-800-367-7623). |
|
|
| North Carolina |
| Description |
Length |
Completion |
| No major construction activity reported on I-95 in North Carolina |
|
|
| South Carolina |
| Description |
Length |
Completion |
One lane closed on I-95 at MP 33
ROAD CONSTRUCTION. 1 LANE AFFECTED, GLYNN CO. |
|
01/30/12 |
| Georgia |
| Description |
Length |
Completion |
| No major construction activity reported on I-95 in Georgia |
|
|
| Florida |
| Description |
Length |
Completion |
| Highway Widening - FL786/PGA Blvd to Donald Ross Rd (Palm Beach County) |
4 mi. |
12/31/11 |
| Highway Widening - Donald Ross Rd to FL706/Indiantown Rd (Palm Beach County) |
4.5 mi. |
04/30/12 |
|
|
|
| Every attempt is made to provide the most current information available. Although information is periodically updated, we are not responsible for it's degree of accuracy. If you have any comments or suggestions in helping us produce a more useful guide, or if you find any inaccuracies, please bring them to our attention. |
|
|