Bridge Installation Over I-95 in Connecticut Scheduled Soon

1271
Connecticut I-95 Traffic | I-95 Construction in Connecticut | New Haven Connecticut | I-95 Exit Guide

The Connecticut Department of Transportation reports that the first of two bridge spans on Route 1 (East Main Street) over I-95 at Exit 9 in Stamford will be moved and set in place in approximately four weeks.

On Friday, May 31 at 11:00 p.m., I-95 motorists will be detoured onto 2-lane temporary roads in each direction while construction is underway.

Earlier in the evening, Route 1 traffic will also be detoured around the work site onto local roads. I-95 and Route 1 will reopen to through traffic by 5:00 a.m. Monday, June 3rd.

The following week Friday, June 7, beginning at 11:00 p.m., the second bridge span will be installed as traffic is detoured again around the construction zone.


For more I-95 travel info, visit  www.i95exitguide.com, the Internet’s largest and most complete website devoted to I-95, America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida! Plus I-95 construction, real-time traffic and road news.

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit Guide,  I-10 Exit Guide , and I-75 Exit Guide.

I-95 Exit Guide
The I-95 Exit Information Guide is one of the most popular travel destinations on the Internet. This website features detailed listings for exit services all along Interstate 95, from Maine to Florida.