The Rhode Island Department of Transportation reports the following travel restrictions associated with I-95 construction and maintenance operations:

Overnight Restrictions

  • Providence: I-195 East and West, from Exit 1 (Point St./Eddy St.) to Exit 2 (India St./South Main St.), alternating lane closures for a bridge inspection, Thursday night from 9:00 p.m. to 4:00 a.m. the following day.

Weekday Restrictions

  • Cranston: I-95 North at the Exit 16 (Rte. 10) interchange, shoulder closures with ramp narrowing for highway lighting work, Thursday from 9:00 a.m. to 2:00 p.m.
  • East Greenwich to Cranston: I-95 North and South, at the on- and off-ramps from Exit 6A (Hopkins Hill Rd.) to Exit 16 (Rte. 10), partial right lane closures in a moving operation for pothole patching, Thursday from 9:00 a.m. to 2:30 p.m. Expect delays.
  • Exeter/Richmond: I-95 North and South, from Exit 4 (Rte. 3) to Exit 5 (Rte. 102), lane and shoulder closures for survey work, thru Friday from 7:00 a.m. to 3:00 p.m.
  • Hopkinton: I-95 North and South, from Exit 3 (Rte. 138) to the Wood River Valley Bridge over Mechanic St., lane and shoulder closures for survey work, thru Friday from 7:00 a.m. to 3:00 p.m.
  • Providence: I-95 North, from Exit 16 (Rte. 10) to Exit 18 (Thurbers Ave.), left lane and shoulder closures for electrical work, Friday from 9:00 a.m. to 2:30 p.m.
  • Richmond to West Greenwich: I-95 North and South, from Exit 1 (Rte. 3) to Exit 6A (Hopkins Hill Rd.), partial lane closures in a moving operation for pothole patching, Thursday from 8:30 a.m. to 2:30 p.m. Expect delays.
  • Warwick: I-95 North, from Exit 9 (Rte. 4) to Exit 12 (Rte. 113), shoulder closures for highway lighting work, Thursday from 9:00 a.m. to 2:00 p.m.

For more I-95 construction info, visit  www.i95exitguide.com, the Internet’s largest and most complete website devoted to I-95, America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida! Plus I-95 construction, real-time traffic and road news.

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit Guide,  I-10 Exit Guide , and I-75 Exit Guide.

Lane and Ramp Closures, Delays for I-95 Construction in Rhode Island

The Rhode Island Department of Transportation reports the following I-95 construction and maintenance projects that may impact travel through Friday, November 3, 2017:

Weekend Restrictions

  • Providence: I-95 South at Exit 22 (Rtes. 6 & 10/Downtown Providence) and Exit 21 (Atwells Ave.), right lane closed and ramp narrowing for construction, Saturday from 3 a.m. to 8 a.m.
  • Richmond/Hopkinton: I-95 South and North, from Exit 3 (Rte. 138) to Exit 1 (Rte. 3), right shoulder closures in a moving operation for brush cutting and chipping, Saturday from 6:30 a.m. to 1:30 p.m.

Temorary Exit Closure

  • Providence: I-95 North at Exit 22B (Rtes. 6 & 10) and Exit 22C (Providence Place), exits closed for construction, Monday night from midnight to 8 a.m. the following day. Follow signed detour. Please note: the ramps will also be narrowed Tuesday from 6 a.m. to 8 a.m. Delays anticipated.

Overnight Restrictions

  • Cranston: I-95 North and South under Rte. 10, alternating lane closures for a bridge inspection, Sunday-Thursday nights from 9 p.m. to 5 a.m. the following day.
  • Cranston/Providence: I-95 North and South, from just north of the Exit 16 interchange to the Oxford Street overpass, alternating lane closures for construction, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.
  • Hopkinton: I-95 North and South, from the Connecticut state line to Exit 2 (Hopkinton), alternating lane closures for a bridge inspection, Sunday and Monday nights from 9 p.m. to 4 a.m. the following day.
    • I-95 North: Sunday night
    • I-95 South: Monday night
  • Pawtucket: I-95 North and South, under Main St. and Garden St., alternating lane closures for a bridge inspection, Monday and Tuesday nights from 9 p.m. to 4 a.m. the following day.
    • I-95 North: Monday night
    • I-95 South: Tuesday night
  • Pawtucket: I-95 North, from Exit 28 (School St.) to Exit 30 (East St.), left lane and shoulder closures for drainage work, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day.
  • Pawtucket/Providence: I-95 South, from Exit 27 (George St.) to Exit 25 (Smithfield Ave.), left lane and shoulder closures for drainage work, Monday night from 9 p.m. to 5 a.m. the following day.
  • Providence: I-95 South, from Exit 23 (Charles St.) to Exit 20 (I-195), alternating lane closures for construction, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day.
  • Providence: I-95 North and South, from Exit 23 (Rte. 146/Charles St.) to Exit 25 (Smithfield Ave.), alternating lane closures for a bridge inspection, Wednesday and Thursday nights from 9 p.m. to 5 a.m. the following day. Please note: lane shifts will also take place on the on-ramps under Branch Ave.
  • Providence: I-95 North, from Exit 18 (Thurbers Ave.) to Exit 19 (I-195), right lane and shoulder closures for electrical work, Thursday night from 9 p.m. to 5 a.m. the following day.
  • Warwick to Pawtucket: I-95 North and South, from I-295 to the Massachusetts state line, partial lane closures in a moving operation for striping, Sunday-Thursday nights from 8 p.m. to 5 a.m. the following day.
  • West Greenwich to Cranston: I-95 North and South, from Exit 6A (Hopkins Hill Rd.) to Exit 16 (Rte. 10), left lane and shoulder closures in a moving operation for sweeping, Monday night from 9 p.m. to 5 a.m. the following day.

Weekday Restrictions

  • Hopkinton: I-95 North at the Connecticut state line, right shoulder closed for overhead sign work, Thursday from 1 p.m. to 3 p.m.
  • Providence: I-95 South, from Exit 17 (Rte. 1) to Exit 16 (Rte. 10), including the off-ramp to Rte. 10 North, right lane and shoulder closures and ramp narrowing for brush cutting, Monday from 9 a.m. to 2:30 p.m.
  • Providence: On the ramp from I-195 West to I-95 South, left lane closed for construction, Monday-Friday from 6 a.m. to 3 p.m. Watch for construction vehicles exiting and entering the work zone.
  • Richmond to West Greenwich: I-95 North and South, from Exit 3 (Rte. 138) to Exit 6 (Rte. 3), right shoulder closures in a moving operation for pavement repair, Wednesday from 8:30 a.m. to 2:30 p.m.
  • West Greenwich: I-95 South, from Exit 6A (Hopkins Hill Rd.) to Exit 5 (Rte. 102), left shoulder closed in a moving operation for pavement repair, Monday from 8:30 a.m. to 2:30 p.m.
  • West Greenwich: I-95 South at Exit 5B (Rte. 102 North), right shoulder closed for overhead sign work, Thursday from 11 a.m. to 1 p.m.

Ongoing Restrictions

  • Exeter/Richmond: Watch for construction vehicles exiting and entering the median area along I-95 South after Exit 5 (Rte. 102) at the Tefft Hill Trail Bridge, weekdays from 7 a.m. to 4 p.m. through Summer 2017.

For more I-95 construction info, visit www.i95exitguide.com, the Internet’s largest and most complete website devoted to America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida!

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit Guide,  I-10 Exit Guide , and I-75 Exit Guide.

Exit Closure, Detour for I-95 Construction in Rhode Island

The Rhode Island Department of Transportation reports the following travel restrictions associated with I-95 construction through Friday,  August 18, 2017:

Temporary Exit Closure

  • Providence: I-95 North at Exit 18 (Thurbers Ave.), exit closed for paving, Monday night from 8 p.m. to 6 a.m. the following day. Follow signed detour.

Overnight Restrictions

  • Cranston/Providence: I-95 North and South, from just north of the Exit 16 interchange to the Oxford St. overpass, alternating lane closures for milling and paving, Monday-Thursday nights from 7 p.m. to 6 a.m. the following day.
  • Providence: I-95 North, at the Clifford St. Bridge between the Point St. overpass and the Broad St. Bridge, alternating lane closures for construction, Thusday night from 8 p.m. to 6 a.m. the following day.
  • Providence: I-95 South, from Exit 23 (Charles St.) to Exit 20 (I-195), alternating lane closures for striping, Monday-Thursday nights from 9 p.m. to 6 a.m. the following day.
  • Warwick: I-95 North and South at Exit 13 (Airport Connector), alternating lane closures for bridge work, Monday-Thursday nights from 7 p.m. to 6 a.m. the following day.
  • Warwick: I-95 North, from Exit 12 (Rte. 113) to Exit 15 (Jefferson Blvd.), and I-95 South, from Exit 16 (Rte. 10) to Exit 13 (Airport Connector), alternating lane and shoulder closures for a bridge inspection, Wednesday and Thursday nights from 9 p.m. to 5 a.m. the following day.
    • Wednesday night: I-95 North
    • Thursday night: I-95 South

Weekday Restrictions

  • Providence/Pawtucket: I-95 North and South, from Exit 23 (Rte. 146/Charles St.), to Exit 30 (East St.), partial right lane and shoulder closures in a moving operation for drainage work, Tuesday-Friday from 9 a.m. to 2:30 p.m.
  • Providence: I-95 North, at the Clifford St. Bridge between the Point St. overpass and the Broad St. Bridge, alternating lane closures for construction, Tuesday-Friday from 6 a.m. to 2 p.m.
  • Richmond: I-95 North and South, just before and after Mechanic St. and the Tefft Hill Trail Bridge, right lane and shoulder closures in a moving operation for survey work, Wednesday-Friday from 7 a.m. to 5 p.m.

Ongoing Restrictions

  • Exeter/Richmond: Watch for construction vehicles exiting and entering the median area along I-95 South after Exit 5 (Rte. 102) at the Tefft Hill Trail Bridge, weekdays from 7 a.m. to 4 p.m. through Summer 2017.

For more I-95 construction info, visit  www.i95exitguide.com, the Internet’s largest and most complete website devoted to I-95, America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida! Plus I-95 construction, real-time traffic and road news.

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit Guide,  I-10 Exit Guide , and I-75 Exit Guide.

I-95 Construction Means Lane Closures in Rhode Island

The Rhode Island Department of Transportation reports the following travel advisories associated with I-95 construction activities through Friday, August 11, 2017.

Overnight Restrictions

  • Cranston/Providence: I-95 North and South, from just north of the Exit 16 interchange to the Oxford St. overpass, alternating lane closures for milling and paving, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.
  • Providence: I-95 North, at the Clifford St. Bridge between the Point St. overpass and the Broad St. Bridge, alternating lane closures for construction, Monday-Thursday nights from 8 p.m. to 6 a.m. the following day.
  • Providence: I-95 South, from Exit 23 (Charles St.) to Exit 20 (I-195), alternating lane closures for drainage work, Sunday-Thursday nights from 9 p.m. to 6 a.m. the following day.
  • Warwick to Pawtucket: I-95 North and South, I-295 to the Massachusetts state line, partial right lane closures in a moving operation for roadway striping, Sunday-Thursday nights from 8 p.m. to 5 a.m. the following day.

Ongoing Restrictions

  • Exeter/Richmond: Watch for construction vehicles exiting and entering the median area along I-95 South after Exit 5 (Rte. 102) at the Tefft Hill Trail Bridge, weekdays from 7 a.m. to 4 p.m. through Summer 2017.

For more I-95 construction info, visit  www.i95exitguide.com, the Internet’s largest and most complete website devoted to I-95, America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida! Plus I-95 construction, real-time traffic and road news.

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit Guide,  I-10 Exit Guide , and I-75 Exit Guide.

 

Lane Closures, Traffic Restrictions for I-95 Construction in Rhode Island

The Rhode Island Department of Transportation reports the following I-95 construction and maintenance operations that will result in travel restrictions through Friday, July 28, 2017.

Overnight Restrictions

  • Cranston/Providence: I-95 North and South, from Elmwood Ave. to Eddy St., alternating lane closures for bridge work, Sunday-Thursday nights from 7 p.m. to 6 a.m. the following day.
  • Richmond/Hopkinton: I-95 South, from Rte. 3 to the Connecticut state line, left lane closed in a moving operation for weed whacking in the center barrier, Monday night from 9:30 p.m. to 6 a.m. the following day.

Weekday Restrictions

  • Cranston to Cumberland: Expect right shoulder closures in a moving operation for survey work at the following locations on I-295 North and South, Monday and Tuesday from 9 a.m. to 4 p.m.: at Exit 4 (Rte. 14); at the Rte. 6A Bridge in Johnston; at the Rte. 6 Bridge in Johnston; at the on-ramp from Rte. 6 to I-295 North in Johnston; at the Greenville Ave. Bridge in Johnston; and at the Leigh Rd. Bridge in Cumberland.
  • Hopkinton to Pawtucket: Expect right shoulder closures in a moving operation for survey work at the following locations on I-95 North and South, Monday and Tuesday from 9 a.m. to 4 p.m.: at the Mechanic St. Bridge in Richmond, between Exit 2 (Hopkinton) and Exit 3B (Rte. 138); at the Tefft Hill Trail Bridge in Exeter, between Exit 4 (Rte. 3) and Exit 5 (Rte. 102); at Exit 10B (Rte. 117 West); at the Oxford St. Bridge in Providence; and at Exit 30 (East St.)
  • Providence/East Providence: Expect right shoulder closures in a moving operation for survey work at the following locations on I-195 East and West, Monday and Tuesday from 9 a.m. to 4 p.m.: at the Gano St. Bridge in Providence; and at the Valley St. Bridge in East Providence.

Ongoing Restrictions

  • Exeter/Richmond: Watch for construction vehicles exiting and entering the median area along I-95 South after Exit 5 (Rte. 102) at the Tefft Hill Trail Bridge, weekdays from 7 a.m. to 4 p.m. through Summer 2017.

For more I-95 construction info, visit  www.i95exitguide.com, the Internet’s largest and most complete website devoted to I-95, America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida! Plus I-95 construction, real-time traffic and road news.